Cross Check General Contracting

Our Work

A visual record of engineering execution across six disciplines — for NEWWAVES Energy / ADNOC, Miral Experiences, Al Ain Zoo, and more.

Miral Experiences — CLYMB, Ferrari World, YAS Water World, WBW, Yas Bay Etihad Arena.

  • Miral Experiences LLC·17/10/2025Completed

    OPEX-CLYMB — Bench height modification and upholstery.

  • Miral Experiences LLC·28/08/2025Completed

    OPEX-Ferrari World AD — Provision of Safety Grating with lock for Cage Ladder F47.

  • Miral Experiences LLC·18/06/2025Completed

    Varnishing of Wooden Poles and Fences around YAS Water World Park — 1200+ sqm.

  • Miral Experiences LLC·02/06/2025Completed

    OPEX-CLYMB — Refurbishment & repainting of linking-bridge columns (rope access).

  • Yas Bay Etihad Arena·07/08/2025Completed

    Additional rigid supports for rainwater pipes — ME.102, ME.104 plant rooms & MC.106 lobby.

  • Miral Experiences LLC·28/08/2025Completed

    OPEX-FWAD — Storage PVC curtain replacement.

  • Miral Experiences LLC·03/09/2025Completed

    FSDE — Flooring tiles re-arrangement.

  • Miral Experiences LLC·18/09/2025Completed

    OPEX-CLYMB — Section repainting with washable paint, Level 1 equipment store.

  • Miral Experiences LLC·28/08/2025Ongoing

    M-SCENIC WBW Batman queue-line showcase modifications (glass doors provision).

Facility Management & Fit-out Works
Facility Management & Fit-out Works 1
Facility Management & Fit-out Works 2
Facility Management & Fit-out Works 3
Facility Management & Fit-out Works 4
Facility Management & Fit-out Works 5
Facility Management & Fit-out Works 6
Facility Management & Fit-out Works 7
Facility Management & Fit-out Works 8
Facility Management & Fit-out Works 9
Facility Management & Fit-out Works 10
Facility Management & Fit-out Works 11
Facility Management & Fit-out Works 12
Facility Management & Fit-out Works 13
Facility Management & Fit-out Works 14
Facility Management & Fit-out Works 15

GTSC Mussaffah interlocking, Ferrari World roof panel replacement, WBW roof dampers refurbishment.

  • GTSC — Mussaffah·10/02/2025·PO-2007894Completed

    Interlocking tiles installation.

  • Miral Experiences LLC·21/10/2025·PO-255234933Ongoing

    CAPEX-WBW — Roof dampers main-entrance planters refurbishment (marble cladding + floor cracks grouting).

  • Miral Experiences LLC·05/11/2025·PO-255237064Ongoing

    Ferrari World — red-roof damaged panels replacement and waterproofing (FWAD).

Civil Works & Maintenance
Civil Works & Maintenance 1

NEWWAVES / ADNOC pipe spool reducers, re-coiling reels, support hurdles, Haspen Wagen trailers, WBW Gotham Stage Zip Line alteration.

  • NEWWAVES / ADNOC·18/12/2024·PO-NW-CCG-0012Completed

    Pipe Spool Reducer 4" SCh80, #1500 RTJ → #600 RTJ flange — third-party hydro tested and NDT certified. Re-Coiling Reel Stopper Set: 4 stoppers + safety locking bar × 30 pcs.

  • NEWWAVES / ADNOC·18/12/2024·PO-NW-CCG-0013Completed

    Re-Coiling Reel manufactured per Soluforce design with mobility & storage modifications — MS galvanised / zinc-painted × 26 pieces.

  • NEWWAVES / ADNOC·30/06/2025·PO-NW-CCGC-003Completed

    Haspen Wagen Trailer manufactured to specimen, modified to NEWWAVES requirements.

  • NEWWAVES / ADNOC·16/02/2026·PO-NW-CCG-0026Completed

    Design, fabrication and supply of Pipe Support Hurdles — 2000 × 1000 × 800 mm.

  • Miral Experiences LLC·15/12/2025·PO-255242304Ongoing

    WBW Gotham Stage Zip Line — alteration (EPC).

  • Private·20/01/2026Ongoing

    Electromechanical warehouse dismantling, relocation, installation and commissioning.

Electromechanical EPC — Fabrication & Construction
Electromechanical EPC — Fabrication & Construction 1
Electromechanical EPC — Fabrication & Construction 2
Electromechanical EPC — Fabrication & Construction 3
Electromechanical EPC — Fabrication & Construction 4
Electromechanical EPC — Fabrication & Construction 5
Electromechanical EPC — Fabrication & Construction 6
Electromechanical EPC — Fabrication & Construction 7

Al Ain Zoo walk-in freezer & chiller (rental), Ferrari World F05 winch duct insulation, ANKO café MCCB, private chillers and rain-water drains.

  • Miral Experiences LLC·15/10/2025·PO-255234019Completed

    OPEX-SOW-2025 — Repair of package-unit duct insulation, Ferrari World F05 Winch building.

  • Almurouj Experiences·26/09/2025·AX-PO-255200011Installation Completed / Rental Ongoing

    Design, fabrication and installation of Walk-in Freezer & Chiller (2 units) for Al Ain Zoo warehouse — 2.4 × 6.0 m each, on rental basis.

  • Miral Experiences LLC·28/07/2025·PO-255223966Completed

    ANKO café — Provision of MCCB on ADDC main panel, cable pulling, civil works (tile cutting & replacement), and countertop structure modification.

  • Private Building·02/03/2026Completed

    Rain-water drain — design, supply and installation.

  • Private Building·11/12/2025Completed

    Chiller — design, supply and installation.

MEP EPC & Maintenance
MEP EPC & Maintenance 1
MEP EPC & Maintenance 2
MEP EPC & Maintenance 3
MEP EPC & Maintenance 4
MEP EPC & Maintenance 5
MEP EPC & Maintenance 6
MEP EPC & Maintenance 7

FWAD-SOFT landscape beautification and private-villa hard + soft landscape design.

  • Miral Experiences LLC·09/09/2025·PO-255229445Completed

    OPEX-FWAD-SOFT — Landscape beautification.

  • Private Villa·05/07/2025Completed

    Hard & soft landscape design and implementation.

Landscaping
Landscaping 1
Landscaping 2
Landscaping 3

TLP Age & Medical Restrictions assessment, Al Ain Hot Spring SPA feasibility, Sea World HVAC performance assessment.

  • Miral Experiences LLC·29/05/2025·255216830Completed

    TLP — Age & Medical Restrictions assessment.

  • Miral Experiences LLC·23/07/2025Ongoing

    Al Ain Hot Spring SPA — feasibility study.

  • Miral Experiences LLC·23/02/2026Ongoing

    Sea World — HVAC performance assessment.

Have a Project in Mind?

We'd welcome the opportunity to review your requirements and propose a tailored solution.

Get In Touch